Pelham grid supply point
39 connections of 1 MW and over at Pelham in UK Power Networks's register of 14 Oct 2026: 631.9 MW accepted to connect and 234.3 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| (ANM) Hill Green Farm | BSR Applications Limited | Solar | 95 | Accepted to connect | |
| Crabbs Green Farm | Mythop Renewables Limited | Solar, Storage | 60 | Accepted to connect | 12 Jan 2024 |
| Thurstons Farm | QE Development HoldCo | Solar | 60 | Accepted to connect | |
| Berden Hall Farm PV | Berden Solar Limited | Solar | 50 | Accepted to connect | 20 Jun 2025 |
| Stocking Pelham | Pelham Power Limited | Storage | 50 | Accepted to connect | 31 Dec 2028 |
| Berden Pelham | Stratera Energy Limited | Storage | 50 | Connected | |
| Maggotts End | Low Carbon Solar Park 6 Limited | Solar, Storage | 49.9 | Accepted to connect | 12 Jan 2024 |
| Land Near Hadham Rd | Parkfield Solar Battery Limited | Solar, Storage | 40 | Accepted to connect | 31 Dec 2028 |
| Knowl Green Farm | Knowl Green Solar Park Limited | Solar | 37.5 | Accepted to connect | 31 Dec 2024 |
| Land At Terriers Farm | Astra Ventures Limited | Solar | 35 | Connected | |
| (ANM) Land At Mill Road | Padero Solaer Limited | Solar | 30 | Accepted to connect | |
| (ANM) Water Hall Farm | BF31 WHF Solar Limited | Solar | 25 | Accepted to connect | 31 Dec 2028 |
| Stradishall Solar Farm | Harlaxton Engineering Services | Solar | 24 | Connected | |
| West Thaxted Solar Farm | Cutlers Solar Farm Limited | Solar | 20 | Accepted to connect | 12 Jan 2024 |
| Spriggs Farm | DNO Consulting Limited | Solar | 20 | Connected | |
| Claredown Farm (Previously Known As Hickford Hill Sudbury) | OST Energy Limited | Storage | 20 | Connected | |
| Anm Boxted Hall | Renewable Energy Systems | Solar | 20 | Accepted to connect | 31 Oct 2032 |
| (ANM) Rowley Hill Road | Boultbee Brooks (Renewables Rowley Hill) Limited | Solar | 16 | Accepted to connect | 12 Jan 2024 |
| Buntines Farm | Intelligent Alternatives Limited | Solar | 15 | Connected | |
| Greys Hall Generation | Push Energy | Gas | 14 | Connected | |
| (ANM) Wales End Farm | Noventum Power Limited | Solar | 12.5 | Accepted to connect | 31 Oct 2034 |
| Purton End | Long Meadow Solar Farm Limited | Solar | 12 | Connected | |
| (ANM) Long Meadow Solar Farm | Low Carbon Solar Park 54 Limited | Solar | 12 | Accepted to connect | 31 Oct 2032 |
| (ANM) Tooleys Farm | Gridsource | Solar | 12 | Accepted to connect | 31 Oct 2034 |
| Gosfield Airfield | Camborne Energy Storage Limited | Solar | 10.8 | Connected | |
| Wickham Hall | Wickham Hall Solar Battery Limited | Solar, Storage | 10 | Accepted to connect | 12 Jan 2024 |
| The Hydes Estate Solar PV | Push Energy | Solar | 9 | Connected | |
| (ANM) Land East Of B1256 | Great Dunmow Power Limited | Gas | 7.5 | Accepted to connect | 31 Dec 2028 |
| (ANM) Land At Warmans Farm | Syzygy Renewables Limited | Solar | 6 | Accepted to connect | 31 Dec 2028 |
| Abbess Road | Conrad Energy | Gas | 6 | Connected | |
| Tooleys Solar Farm | Lightsource Renewable Energy Limited | Solar | 5 | Connected | |
| Acrows Energy Park | BIWO Renewables UK Limited | Onshore wind | 4.94 | Accepted to connect | |
| Homefield Road | Aggregated Micro Power Holdings PLC | Gas | 4 | Connected | |
| Land Adjoining The Wallburys | IG Renewables Limited | Solar, Storage | 3.6 | Accepted to connect | |
| 0G3167 Hawkspur Green Solar Farm | Solar Inc Limited | Solar | 3 | Connected | |
| Ugley Landfill Site | Biffa Waste Services | Bioenergy | 2.49 | Connected | |
| Green Tye | Shenton Group | Bioenergy | 1.8 | Connected | |
| Station Works | Occupier Unknown | Bioenergy | 1.19 | Connected | |
| Elsenham Landfill | Viridor Waste Management Limited | Bioenergy | 1 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.