Berden Pelham, Stratera Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Pelham.

Customer
Stratera Energy Limited
Status
Connected
Capacity
50 MW
Maximum import capacity
50 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Pelham
Voltage
132 kV
Date connected
12 Nov 2017
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bishops Stortford
Postcode
SG9 0JB
Export MPAN
1050001382531

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.