Greys Hall Generation

Greys Hall Generation, Push Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 14 MW, grid supply point Pelham.

Customer
Push Energy
Status
Connected
Capacity
14 MW
Maximum import capacity
0.7 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Pelham
Bulk supply point
Belchamp Grid 33kV
Voltage
33 kV
Date connected
4 Dec 2020
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Sudbury
Postcode
CO10 0NH
Export MPAN
1050001391475
Import MPAN
1050001391466

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.