Land Adjoining The Wallburys

Land Adjoining The Wallburys, IG Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.6 MW, grid supply point Pelham.

Customer
IG Renewables Limited
Status
Accepted to connect
Capacity
3.6 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Pelham
Bulk supply point
Bishops Stortford Grid 33kV
Point of connection
Thorley Primary 11kV
Voltage
11 kV
Date accepted
16 Sept 2026
In a connection queue
Yes
Row last updated by the DNO
14 Oct 2026
Licence area
EPN
Address
Land Lying To The West Of Great Hallingbury, Bishops Stortford
Postcode
CM22 7SQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.