Stocking Pelham

Stocking Pelham, Pelham Power Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Pelham.

Customer
Pelham Power Limited
Status
Accepted to connect
Capacity
50 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Pelham
Voltage
132 kV
Date accepted
7 Jul 2020
Target energisation
31 Dec 2028
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Stocking Pelham
Postcode
SG9 0JB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.