(ANM) Land At Warmans Farm
(ANM) Land At Warmans Farm, Syzygy Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Pelham.
- Customer
- Syzygy Renewables Limited
- Status
- Accepted to connect
- Capacity
- 6 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Pelham
- Bulk supply point
- Bishops Stortford Grid 33kV
- Point of connection
- Stansted Airport Main Pr 11kV
- Voltage
- 11 kV
- Date accepted
- 7 Aug 2021
- Target energisation
- 31 Dec 2028
- In a connection queue
- Yes
- Row last updated by the DNO
- 16 Jan 2023
- Licence area
- EPN
- Address
- Burton End, Stansted
- Postcode
- CM24 8UQ
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.