Crabbs Green Farm
Crabbs Green Farm, Mythop Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Pelham.
- Customer
- Mythop Renewables Limited
- Status
- Accepted to connect
- Capacity
- 60 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Pelham
- Voltage
- 132 kV
- Date accepted
- 17 Jun 2020
- Target energisation
- 12 Jan 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 16 Jan 2023
- Licence area
- EPN
- Address
- Stocking Pelham
- Postcode
- SG9 0JB
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.