Grid GuardianOpen the evidence in the app

Crabbs Green Farm

Crabbs Green Farm, Mythop Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Pelham.

Customer
Mythop Renewables Limited
Status
Accepted to connect
Capacity
60 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Pelham
Voltage
132 kV
Date accepted
17 Jun 2020
Target energisation
12 Jan 2024
In a connection queue
Yes
Row last updated by the DNO
16 Jan 2023
Licence area
EPN
Address
Stocking Pelham
Postcode
SG9 0JB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.