Grid GuardianOpen the evidence in the app

Acrows Energy Park

Acrows Energy Park, BIWO Renewables UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.94 MW, grid supply point Pelham.

Customer
BIWO Renewables UK Limited
Status
Accepted to connect
Capacity
4.94 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
Yes (capacity not firm)
Grid supply point
Pelham
Bulk supply point
Thaxted Grid
Point of connection
Acrows Primary
Voltage
11 kV
Date accepted
21 Aug 2026
In a connection queue
Yes
Row last updated by the DNO
14 Sept 2026
Licence area
EPN
Address
Ashdon Road, Saffron Waldon
Postcode
CB10 2NE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.