Knowl Green Farm
Knowl Green Farm, Knowl Green Solar Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 37.5 MW, grid supply point Pelham.
- Customer
- Knowl Green Solar Park Limited
- Status
- Accepted to connect
- Capacity
- 37.5 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Pelham
- Voltage
- 132 kV
- Date accepted
- 14 Nov 2019
- Target energisation
- 31 Dec 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Jul 2024
- Licence area
- EPN
- Address
- Bakers Road, Belchamp St Paul
- Postcode
- CO10 7DF
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.