Knowl Green Farm

Knowl Green Farm, Knowl Green Solar Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 37.5 MW, grid supply point Pelham.

Customer
Knowl Green Solar Park Limited
Status
Accepted to connect
Capacity
37.5 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Pelham
Voltage
132 kV
Date accepted
14 Nov 2019
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Bakers Road, Belchamp St Paul
Postcode
CO10 7DF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.