(ANM) Wales End Farm

(ANM) Wales End Farm, Noventum Power Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 12.5 MW, grid supply point Pelham.

Customer
Noventum Power Limited
Status
Accepted to connect
Capacity
12.5 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Pelham
Bulk supply point
Belchamp Grid 33kV
Voltage
33 kV
Date accepted
10 Jun 2023
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Sudbury
Postcode
CO10 8DE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.