Gosfield Airfield

Gosfield Airfield, Camborne Energy Storage Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10.8 MW, grid supply point Pelham.

Customer
Camborne Energy Storage Limited
Status
Connected
Capacity
10.8 MW
Maximum import capacity
4.79 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Pelham
Bulk supply point
Thaxted Grid 33kV
Voltage
33 kV
Date connected
18 Dec 2014
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Halstead
Postcode
CO9 1SA
Export MPAN
1050000714207

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.