Wickham Hall
Wickham Hall, Wickham Hall Solar Battery Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Pelham.
- Customer
- Wickham Hall Solar Battery Limited
- Status
- Accepted to connect
- Capacity
- 10 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Pelham
- Bulk supply point
- Bishops Stortford Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 9 Oct 2015, 17 Mar 2017
- Target energisation
- 12 Jan 2024, 6 Jun 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Nov 2024
- Licence area
- EPN
- Address
- Hadham Road, Bishops Stortford
- Postcode
- CM23 1JG
Register rows
| Row | Status | MW | Target |
|---|---|---|---|
| 1 | Accepted to connect | 10 | 12 Jan 2024 |
| 2 | Accepted to connect | 10 | 6 Jun 2025 |
Rows at one site are not summed.
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.