Grid GuardianOpen the evidence in the app

Maggotts End

Maggotts End, Low Carbon Solar Park 6 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Pelham.

Customer
Low Carbon Solar Park 6 Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Pelham
Voltage
132 kV
Date accepted
4 Sept 2020
Target energisation
12 Jan 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Maggotts End, Bishops Stortford
Postcode
CM23 1BJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.