Grid GuardianOpen the evidence in the app

Green Tye

Green Tye, Shenton Group, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.8 MW, grid supply point Pelham.

Customer
Shenton Group
Status
Connected
Capacity
1.8 MW
Technology
Bioenergy (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Pelham
Bulk supply point
Bishops Stortford Grid 33kV
Point of connection
Much Hadham Primary 11kV
Voltage
11 kV
Date connected
24 Feb 2021
In a connection queue
No
Row last updated by the DNO
14 Jun 2021
Licence area
EPN
Address
Much Hadham
Postcode
SG10 6JJ
Export MPAN
1023525274926

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.