Wymondley grid supply point
29 connections of 1 MW and over at Wymondley in UK Power Networks's register of 14 Oct 2026: 398.3 MW accepted to connect and 235.8 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| (ANM - N/A) (G) Land South Of The A602 Wymondley Tip | Sustainability Unlimited LLP | Storage | 100 | Accepted to connect | |
| (ANM) Fallow Solar Farm | Low Carbon Solar Park 33 Limited | Solar | 70 | Accepted to connect | 31 Dec 2028 |
| (ANM - N/A) Radwell Bury Farm East | Balance Energy 5 Limited | Storage | 49.95 | Accepted to connect | 31 Oct 2034 |
| Northwest Of Childs Farm | RES Development Company 18 Limited | Solar | 49.9 | Accepted to connect | 31 Oct 2032 |
| Light Source Grid (Muncey PV Solar Park) | Lightsource Renewable Energy Limited | Solar | 45 | Connected | |
| Vine Solar Farm | Emotion Energy Limited | Solar | 45 | Connected | |
| (ANM) Ashwell Road | Pathfinder Clean Energy (PACE) | Solar, Storage | 40 | Accepted to connect | 31 Dec 2024 |
| Bury Lane Farm | EW Pepper Limited | Solar | 25 | Connected | |
| (ANM) London Way | QC Montferrat Limited | Solar, Storage | 25 | Accepted to connect | |
| Land At Redcoats Farm | Brockwell Storage & Solar Limited | Solar, Storage | 25 | Accepted to connect | 28 Apr 2028 |
| Biggleswade Wind Farm | Co-Operative Group PLC | Onshore wind | 20.5 | Connected | |
| (ANM) Kestrel Solar Farm | Low Carbon Solar Park 37 Limited | Solar | 20 | Accepted to connect | 31 Dec 2028 |
| Baldock Road | Green Frog | Bioenergy | 15 | Connected | |
| Highfield Farm | Grupotec Solar UK 3 Limited | Solar | 13.5 | Accepted to connect | 31 Dec 2024 |
| Bassingbourn Solar (Cokenach Estate) | Push Energy Limited | Solar | 12.6 | Connected | |
| Hill Farm | Lark Energy Limited | Solar | 10.5 | Connected | |
| Cavendish Road | AGR Peak Power Limited | Gas | 10 | Connected | |
| Mill Farm | Push Energy (Grid) Limited | Solar | 8 | Connected | |
| Wisbridge Farm | Energy and System Technical Limited | Solar | 8 | Connected | |
| Cavendish Power | AGR | Gas | 8 | Connected | |
| Royston Solar Farm A505 Royston Bypass | Solar Planning Limited | Solar | 7.5 | Connected | |
| Manor Farm | IG Renewables Limited | Solar, Storage | 4.9 | Accepted to connect | |
| Lister Hospital | Dalkia PLC | Gas | 4.5 | Connected | |
| South Close | AMP Energy Services | Gas | 4.05 | Connected | |
| Wallace Power | AMP Energy Services | Fossil - Oil | 4 | Connected | |
| Arlesey Landfill Site | Non Fossil Purchasing Agency | Bioenergy | 3 | Connected | |
| Bygrave Lodge Farm | Powersystems UK Limited | Bioenergy | 2.6 | Connected | |
| Holwell | Midlands Power Networks Limited | Gas | 1.5 | Connected | |
| Buttermilk Hall Farm | Hallwick Energy | Bioenergy | 1.06 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.