Grid GuardianOpen the evidence in the app

Buttermilk Hall Farm

Buttermilk Hall Farm, Hallwick Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.06 MW, grid supply point Wymondley.

Customer
Hallwick Energy
Status
Connected
Capacity
1.06 MW
Technology
Bioenergy (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Stevenage Grid 33kV
Point of connection
Cherry Grn Primary 11kV
Voltage
11 kV
Date connected
1 May 2012
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Buntingford
Postcode
SG9 9RH
Export MPAN
1030077960112

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source