Baldock Road

Baldock Road, Green Frog, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Wymondley.

Customer
Green Frog
Status
Connected
Capacity
15 MW
Maximum import capacity
0.75 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Letchworth Grid 33kV
Voltage
33 kV
Date connected
20 Jan 2016
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Letchworth, Wymondley Main
Postcode
SG6 1UP
Export MPAN
1097000000192

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.