Land At Redcoats Farm

Land At Redcoats Farm, Brockwell Storage & Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25 MW, grid supply point Wymondley.

Customer
Brockwell Storage & Solar Limited
Status
Accepted to connect
Capacity
25 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Wymondley Grid 33kV
Voltage
33 kV
Date accepted
19 Jul 2021
Target energisation
28 Apr 2028
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Hitchin
Postcode
SG4 7UW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.