Bury Lane Farm

Bury Lane Farm, EW Pepper Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25 MW, grid supply point Wymondley.

Customer
EW Pepper Limited
Status
Connected
Capacity
25 MW
Maximum import capacity
25 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Melbourn Grid 33kV
Voltage
33 kV
Date connected
16 Dec 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
West Of Melbourn, Nr Royston
Postcode
SG8 6DF
Export MPAN
1050000729667

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.