Grid GuardianOpen the evidence in the app

Cavendish Road

Cavendish Road, AGR Peak Power Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Wymondley.

Customer
AGR Peak Power Limited
Status
Connected
Capacity
10 MW
Maximum import capacity
0.6 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Stevenage Grid 33kV
Voltage
33 kV
Date connected
4 Jul 2019
In a connection queue
No
Row last updated by the DNO
16 May 2022
Licence area
EPN
Address
Stevenage
Postcode
SG1 2EU
Export MPAN
1050001791578
Import MPAN
1050001791569

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source