Highfield Farm

Highfield Farm, Grupotec Solar UK 3 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 13.5 MW, grid supply point Wymondley.

Customer
Grupotec Solar UK 3 Limited
Status
Accepted to connect
Capacity
13.5 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Wymondley
Bulk supply point
Letchworth Grid 33kV
Voltage
33 kV
Date accepted
2 Jun 2013
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Littington Road, Royston
Postcode
SG8 9NT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.