(ANM) Fallow Solar Farm

(ANM) Fallow Solar Farm, Low Carbon Solar Park 33 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 70 MW, grid supply point Wymondley.

Customer
Low Carbon Solar Park 33 Limited
Status
Accepted to connect
Capacity
70 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Wymondley
Voltage
132 kV
Date accepted
8 Mar 2022
Target energisation
31 Dec 2028
In a connection queue
Yes
Row last updated by the DNO
16 Jan 2023
Licence area
EPN
Address
Royston
Postcode
SG8 7SH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.