Ninfield grid supply point
33 connections of 1 MW and over at Ninfield in UK Power Networks's register of 14 Oct 2026: 544 MW accepted to connect and 279.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Eastlands Farm | MAS 001 Limited | Storage | 240 | Accepted to connect | 11 Sept 2037 |
| Boreham Street | Pelagic Energy Development Limited | Storage | 99.8 | Accepted to connect | 31 Jan 2029 |
| Little Cheyne Court Windfarm | Little Cheyne Court Wind Farm | Onshore wind | 64 | Connected | |
| Land At Little Standard Hill Farm | Trina Solar | Storage | 50 | Accepted to connect | |
| Olives Farm | Balanced Grid Solutions | Storage | 49.9 | Accepted to connect | 31 Dec 2030 |
| Huggins Hall | Bluebell Energy | Storage | 49.9 | Connected | |
| Potmans Lane | Arlington Energy | Storage | 49 | Connected | |
| Colbrans Farm | Colbrans Solar ESS Limited | Storage | 39.9 | Accepted to connect | 31 Dec 2030 |
| Newhaven ERF 8150 | Veolia | Energy from waste | 21 | Connected | |
| Shearwater Solar Farm | Low Carbon UK Solar Investment Company Limited | Storage | 17 | Accepted to connect | 31 Jan 2029 |
| Mathurst Farm Solar | Renewable Connections Solar Holdings Limited | Solar | 16 | Accepted to connect | 31 Mar 2029 |
| Land At Priesthawes Farm | O&G Group Limited | Storage, Solar | 15 | Accepted to connect | 31 Dec 2030 |
| Pashley PV | Sunsave 26 (Pashley) Limited | Solar | 10.1 | Connected | |
| Batbrooks Farm Arlington | G2 Energy | Solar | 10 | Connected | |
| Site not published: Lightsource, Ninfield GSP | Lightsource | Solar | 8.4 | Connected | |
| Upper Clayhill Farm | Lightsource SPV 44 Limited | Solar | 8 | Connected | |
| Shepham Wind Farm | Second Generation Shepham Limited | Onshore wind | 7.5 | Connected | |
| Francis Wood | Lightsource Renewable Energy Limited | Solar | 7 | Connected | |
| Ripe PV | WSE Laughton Level Limited | Solar | 7 | Connected | |
| Natewood Farm | Haymaker Energy | Solar | 7 | Connected | |
| Horam Solar Farm | Dragon Infrastructure Solutions Limited | Solar | 6.5 | Connected | |
| Horam Solar Farm | Vantage RE | Storage | 6.5 | Accepted to connect | |
| Rocks Road | Uckfield Solar Electric Forecourt Limited | Storage | 5.5 | Accepted to connect | 28 Nov 2025 |
| Arlington East PV | Wilbees | Solar | 5 | Connected | |
| Quickbourne Lane | IG Renewables Ltd | Solar, Storage | 4.4 | Accepted to connect | |
| Finmere Power | Urban Reserve (AssetCo) Limited | Gas | 4.1 | Connected | |
| Widehurst Farm | Widehurst Solar Park | Solar | 4 | Connected | |
| Generation Site Landfill Site 474789 | Viridor Waste Management Limited | Bioenergy | 3.2 | Connected | |
| Horam Solar Farm | Solarcentury | Solar | 2 | Connected | |
| Beddingham Landfill Site 474789 | Viridor Waste Management Limited | Bioenergy | 2 | Connected | |
| Pebsham Landfill Site | Biffa Waste Services Limited | Bioenergy | 1.4 | Connected | |
| Bexhill & Hastings WTW | Southern Water Services Limited | Bioenergy | 1.37 | Connected | |
| Pebsham Landfill Site | CEMG Export Portfolio | Bioenergy | 1 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.