Batbrooks Farm Arlington

Batbrooks Farm Arlington, G2 Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Ninfield.

Customer
G2 Energy
Status
Connected
Capacity
10 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Lewes Grid 33kV
Voltage
33 kV
Date connected
25 Mar 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Lower Wick Street, Polegate
Postcode
BN26 6TH
Export MPAN
1900091199379

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.