Grid GuardianOpen the evidence in the app

Mathurst Farm Solar

Mathurst Farm Solar, Renewable Connections Solar Holdings Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16 MW, grid supply point Ninfield.

Customer
Renewable Connections Solar Holdings Limited
Status
Accepted to connect
Capacity
16 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Ninfield
Bulk supply point
Hartley Grid
Voltage
33 kV
Date accepted
21 Jun 2021
Target energisation
31 Mar 2029
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Mathurst Farm Solar, Goudhurst Road, Tonbridge
Postcode
TN12 0HQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source