Grid GuardianOpen the evidence in the app

Eastlands Farm

Eastlands Farm, MAS 001 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 240 MW, grid supply point Ninfield.

Customer
MAS 001 Limited
Status
Accepted to connect
Capacity
240 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Ninfield
Voltage
132 kV
Date accepted
10 May 2022
Target energisation
11 Sept 2037
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
The Stream, Battle
Postcode
TN33 9BB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source