Potmans Lane

Potmans Lane, Arlington Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49 MW, grid supply point Ninfield.

Customer
Arlington Energy
Status
Connected
Capacity
49 MW
Maximum import capacity
49.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Ninfield
Voltage
132 kV
Date accepted
31 Dec 2024
Date connected
12 Oct 2023
In a connection queue
No
Row last updated by the DNO
14 Oct 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Battle
Postcode
TN33 9BL
Export MPAN
1900092272807
Import MPAN
1900092272791

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.