Rocks Road

Rocks Road, Uckfield Solar Electric Forecourt Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.5 MW, grid supply point Ninfield.

Customer
Uckfield Solar Electric Forecourt Limited
Status
Accepted to connect
Capacity
5.5 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Lewes Grid 33kV
Point of connection
Uckfield 11kV
Voltage
11 kV
Date accepted
14 Dec 2018
Target energisation
28 Nov 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Uckfield
Postcode
TN22 3PT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.