Olives Farm

Olives Farm, Balanced Grid Solutions, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Ninfield.

Customer
Balanced Grid Solutions
Status
Accepted to connect
Capacity
49.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Ninfield
Voltage
132 kV
Date accepted
6 Jan 2020
Target energisation
31 Dec 2030
In a connection queue
Yes
Row last updated by the DNO
15 May 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Battle
Postcode
TN33 9HD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.