Shearwater Solar Farm

Shearwater Solar Farm, Low Carbon UK Solar Investment Company Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 17 MW, grid supply point Ninfield.

Customer
Low Carbon UK Solar Investment Company Limited
Status
Accepted to connect
Capacity
17 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Eastbourne Grid 33kV
Voltage
33 kV
Date accepted
21 Apr 2021
Target energisation
31 Jan 2029
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Lottbridge Drove, Eastbourne
Postcode
BN23 6QJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.