Grid GuardianOpen the evidence in the app

Pebsham Landfill Site

Pebsham Landfill Site, Biffa Waste Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.4 MW, grid supply point Ninfield.

Customer
Biffa Waste Services Limited
Status
Connected
Capacity
1.4 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Ninfield Grid 33kV
Point of connection
Bexhill Town 11kV
Voltage
11 kV
Date connected
16 Oct 2013
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Freshfields, Pebsham
Postcode
TN38 8AY
Export MPAN
1900090713848

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source