Grid GuardianOpen the evidence in the app

Upper Clayhill Farm

Upper Clayhill Farm, Lightsource SPV 44 Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8 MW, grid supply point Ninfield.

Customer
Lightsource SPV 44 Limited
Status
Connected
Capacity
8 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Lewes Grid 33kV
Voltage
33 kV
Date connected
18 Dec 2015
In a connection queue
No
Row last updated by the DNO
12 Aug 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Uckfield Road, Lewes
Postcode
BN8 5RR
Export MPAN
1900091343769

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source