Natewood Farm

Natewood Farm, Haymaker Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Ninfield.

Customer
Haymaker Energy
Status
Connected
Capacity
7 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Ninfield
Bulk supply point
Polegate Grid 33kV
Point of connection
Hailsham 11kV
Voltage
11 kV
Date connected
24 Jan 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Polegate Road, Polegate
Postcode
BN27 3PH
Export MPAN
1900091192276

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.