Huggins Hall

Huggins Hall, Bluebell Energy, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Ninfield.

Customer
Bluebell Energy
Status
Connected
Capacity
49.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Ninfield
Voltage
132 kV
Date connected
29 Oct 2017
In a connection queue
No
Row last updated by the DNO
14 Dec 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Glassenbury
Postcode
TN17 2QJ
Export MPAN
1900091523310

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.