Kemsley grid supply point
28 connections of 1 MW and over at Kemsley in UK Power Networks's register of 14 Oct 2026: 250.6 MW accepted to connect and 283.7 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Barge Way | FPC Electric Land Limited | Storage | 99.9 | Accepted to connect | 12 Jan 2029 |
| Kemsley (K3) CHP Facility | London Power Associates Limited | Energy from waste | 65 | Connected | |
| School Lane | JBM Solar Projects 27 Limited | Storage, Solar | 49.9 | Accepted to connect | 30 Jan 2025 |
| Cowstead Battery Storage | Eclipse Power Networks Limited | Storage | 49 | Connected | |
| Grovehurst Energy | ST Regis Paper Company Limited | Gas | 42 | Connected | |
| Pitstock Farm | Voltalia UK Limited | Solar, Storage | 40.8 | Accepted to connect | 31 Oct 2036 |
| Ridham Dock Biomass | MVV Environment Ridham Limited | Bioenergy | 25 | Connected | |
| Land On The West Side Of Selling Road | Ilos New Energy UK Limited | Solar | 18 | Accepted to connect | |
| Old House Lane | Ilos New Energy UK Limited | Solar | 17 | Accepted to connect | |
| Brielle Way Generation | UK Power Reserve Thames Steel Power Station | Fossil - Oil | 16 | Connected | |
| Paper Mill (K4) | DS Smith Paper Limited | Gas | 14 | Accepted to connect | |
| Sittingbourne Power Generation Plant | Conrad (Sittingbourne) Limited | Gas | 12 | Connected | |
| New Rides Wind Farm | Energiepark UK NR GMBH & CO. KG | Onshore wind | 10 | Connected | |
| Solar Farm West Of Bobbing | Solar Securities Limited | Solar | 10 | Connected | |
| Port Of Sheerness Windfarm 8559 | Port of Sheerness Wind Farms Limited | Onshore wind | 10 | Connected | |
| Tiptree Solar Park | OPDE UK Limited | Solar | 9 | Connected | |
| Tonge Solar Farm | GW Finn & Sons | Solar | 7 | Connected | |
| Old Rides | Sunsave 9 (Old Rides) Limited | Solar | 6 | Connected | |
| Abbey Fields 400175 | Abbey Fields Solar Limited | Solar | 5 | Connected | |
| Land off Old Ferry Road | Enviromena Project Management UK Limited | Solar | 4.9 | Accepted to connect | |
| HMP Stanford Hill | Standford Hill Wind Farm | Onshore wind | 4.6 | Connected | |
| South Lees Farm | Solarcentury | Solar | 4.2 | Connected | |
| New Hook Eastchurch | Solarcentury | Solar | 4.2 | Connected | |
| Ridham Dock | Clean Earth Energy Limited | Solar, Wind | 3.06 | Accepted to connect | |
| Ridham Dock | Lhyfe UK Limited | Solar | 3.02 | Accepted to connect | |
| Plot 1 Kemsley Fields | Wm Morrison PLC | Solar | 2 | Connected | |
| New Kaine Farm | Dragon Infrastructure Solutions Limited | Solar | 1.7 | Connected | |
| Queenborough Sewage Works | Southern Water Services Limited | Fossil - Oil | 1 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.