Brielle Way Generation
Brielle Way Generation, UK Power Reserve Thames Steel Power Station, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16 MW, grid supply point Kemsley.
- Customer
- UK Power Reserve Thames Steel Power Station
- Status
- Connected
- Capacity
- 16 MW
- Technology
- Fossil - Oil (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Kemsley
- Bulk supply point
- Sheerness Grid 33kV
- Voltage
- 33 kV
- Date connected
- 22 Sept 2018
- In a connection queue
- No
- Row last updated by the DNO
- 12 Aug 2022
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Thamesteel, Sheerness
- Postcode
- ME12 1TH
- Export MPAN
- 1900091523125
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.