Barge Way
Barge Way, FPC Electric Land Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Kemsley.
- Customer
- FPC Electric Land Limited
- Status
- Accepted to connect
- Capacity
- 99.9 MW
- Technology
- Storage (Storage - Electrochemical (Batteries))
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Kemsley
- Voltage
- 132 kV
- Date accepted
- 1 May 2022
- Target energisation
- 12 Jan 2029
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Jul 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Sittingbourne
- Postcode
- ME10 2FE
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.