Grid GuardianOpen the evidence in the app

Old Rides

Old Rides, Sunsave 9 (Old Rides) Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6 MW, grid supply point Kemsley.

Customer
Sunsave 9 (Old Rides) Limited
Status
Connected
Capacity
6 MW
Maximum import capacity
0.03 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Sittingbourne Grid 33kV
Voltage
33 kV
Date connected
18 Jan 2014
In a connection queue
No
Row last updated by the DNO
14 Jul 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Leysdown Road, Eastchurch
Postcode
ME12 4BD
Export MPAN
1900091024526
Import MPAN
1900091024526

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source