School Lane

School Lane, JBM Solar Projects 27 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Kemsley.

Customer
JBM Solar Projects 27 Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Storage, Solar (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Kemsley
Voltage
132 kV
Date accepted
26 Feb 2021
Target energisation
30 Jan 2025
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Iwade, Sittingbourne
Postcode
ME9 8QG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.