Grid GuardianOpen the evidence in the app

New Rides Wind Farm

New Rides Wind Farm, Energiepark UK NR GMBH & CO. KG, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Kemsley.

Customer
Energiepark UK NR GMBH & CO. KG
Status
Connected
Capacity
10 MW
Maximum import capacity
5 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Sheerness Grid 33kV
Voltage
33 kV
Date connected
21 Nov 2018
In a connection queue
No
Row last updated by the DNO
12 Aug 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Leysdown Road, Eastchurch
Postcode
ME12 4DD
Export MPAN
1900091718322

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source