Grid GuardianOpen the evidence in the app

Plot 1 Kemsley Fields

Plot 1 Kemsley Fields, Wm Morrison PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Kemsley.

Customer
Wm Morrison PLC
Status
Connected
Capacity
2 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Grovehurst Energy 33kV
Point of connection
Grovehurst Local 11kV
Voltage
11 kV
Date connected
11 May 2013
In a connection queue
No
Row last updated by the DNO
12 Aug 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Fleet End, Sittingbourne
Postcode
ME10 2FD
Export MPAN
1900091017955

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source