Grid GuardianOpen the evidence in the app

New Hook Eastchurch

New Hook Eastchurch, Solarcentury, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.2 MW, grid supply point Kemsley.

Customer
Solarcentury
Status
Connected
Capacity
4.2 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Sittingbourne Grid 33kV
Voltage
33 kV
Date connected
21 Jun 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
South Lees Farm, Eastchurch
Postcode
ME12 3SW
Export MPAN
1900091121266

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.