Paper Mill (K4)

Paper Mill (K4), DS Smith Paper Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 14 MW, grid supply point Kemsley.

Customer
DS Smith Paper Limited
Status
Accepted to connect
Capacity
14 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Grovehurst Energy 33kV
Voltage
33 kV
Date accepted
26 Apr 2019
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Kemsley
Postcode
ME10 2SG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.