Ridham Dock
Ridham Dock, Clean Earth Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.06 MW, grid supply point Kemsley.
- Customer
- Clean Earth Energy Limited
- Status
- Accepted to connect
- Capacity
- 3.06 MW
- Technology
- Solar, Wind (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Kemsley
- Bulk supply point
- Grovehurst
- Point of connection
- Grovehurst
- Voltage
- 11 kV
- Date accepted
- 19 May 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Jun 2025
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Kemsley Fields Business Park, Sittingbourne
- Postcode
- ME9 8SR
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.