Ridham Dock

Ridham Dock, Clean Earth Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.06 MW, grid supply point Kemsley.

Customer
Clean Earth Energy Limited
Status
Accepted to connect
Capacity
3.06 MW
Technology
Solar, Wind (Photovoltaic)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Grovehurst
Point of connection
Grovehurst
Voltage
11 kV
Date accepted
19 May 2025
In a connection queue
Yes
Row last updated by the DNO
13 Jun 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Kemsley Fields Business Park, Sittingbourne
Postcode
ME9 8SR

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.