HMP Stanford Hill

HMP Stanford Hill, Standford Hill Wind Farm, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.6 MW, grid supply point Kemsley.

Customer
Standford Hill Wind Farm
Status
Connected
Capacity
4.6 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Kemsley
Bulk supply point
Sheerness Grid 33kV
Point of connection
Eastchurch Prison 6.6kV
Voltage
6.6 kV
Date connected
24 Dec 2012
In a connection queue
No
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Brabazon Road, Eastchurch
Postcode
ME12 4AA
Export MPAN
1900090919772

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source