Pitstock Farm

Pitstock Farm, Voltalia UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40.8 MW, grid supply point Kemsley.

Customer
Voltalia UK Limited
Status
Accepted to connect
Capacity
40.8 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Kemsley
Bulk supply point
Sittingbourne Grid
Point of connection
Sittingbourne Grid 33kV
Voltage
33 kV
Date accepted
16 Dec 2022
Target energisation
31 Oct 2036
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Pitstock Road, Sittingbourne
Postcode
ME9 0QW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.