17 connections of 1 MW and over at Braintree in UK Power Networks's register of 14 Oct 2026: 56.7 MW accepted to connect and 158.8 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Church Road | Fichtner Consulting Engineers Limited | Energy from waste | 55 | Connected | |
| (ANM) Links Rd | Links Solar Farm Limited | Solar | 26 | Connected | |
| (ANM) Parkgate Farm | Parkgate Farm Solar Limited | Solar | 18 | Accepted to connect | 6 Jan 2025 |
| Cressing Solar Farm | ESCO NRG Limited | Solar | 18 | Connected | |
| (ANM) Feeringbury Farm | Padero Solaer Limited | Solar | 15 | Accepted to connect | 31 Oct 2032 |
| (ANM) Land At Cressing Farm | Eden CF Solar Limited | Solar | 13.8 | Accepted to connect | 31 Dec 2024 |
| Kentishes (Lyons Hall) | Energy and System Technical Limited | Solar | 10.8 | Connected | |
| Bumpsted Hill | Dunmow Solar Limited | Solar | 10 | Connected | |
| Cut Throat Lane | Foundation Property & Capital | Gas | 10 | Connected | |
| Land To The West Of The A131 | Belectric Solar Limited | Storage | 10 | Connected | |
| Kentish Farm 1 | Kentishes Solar Farm 3 Limited | Storage | 6.7 | Accepted to connect | 6 Jan 2025 |
| Kentishes Farm | GEMEC Limited | Solar | 6.52 | Connected | |
| Drappers Farm | Lightsource Limited | Solar | 5 | Connected | |
| (ANM) Crittal Road | AMP | Gas | 4.05 | Connected | |
| Kentish Farm 2 | Kentish Solar Farm 3 Limited | Solar | 3.2 | Accepted to connect | 6 Jan 2025 |
| Bluebridge Industial Estate | Tamar Energy Limited | Bioenergy | 2.4 | Connected | |
| Wade International Halstead | Eco-Kinetics | Solar | 1 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.