Grid GuardianOpen the evidence in the app

Church Road

Church Road, Fichtner Consulting Engineers Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 55 MW, grid supply point Braintree.

Customer
Fichtner Consulting Engineers Limited
Status
Connected
Capacity
55 MW
Maximum import capacity
24.13 MW
Technology
Energy from waste (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Braintree
Voltage
132 kV
Date connected
3 Jul 2025
In a connection queue
No
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
Braintree
Postcode
CM77 8EP
Export MPAN
1050002912472
Import MPAN
1050002912463

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source