Church Road
Church Road, Fichtner Consulting Engineers Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 55 MW, grid supply point Braintree.
- Customer
- Fichtner Consulting Engineers Limited
- Status
- Connected
- Capacity
- 55 MW
- Maximum import capacity
- 24.13 MW
- Technology
- Energy from waste (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Braintree
- Voltage
- 132 kV
- Date connected
- 3 Jul 2025
- In a connection queue
- No
- Row last updated by the DNO
- 14 Aug 2026
- Licence area
- EPN
- Address
- Braintree
- Postcode
- CM77 8EP
- Export MPAN
- 1050002912472
- Import MPAN
- 1050002912463
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.