Grid GuardianOpen the evidence in the app

Cressing Solar Farm

Cressing Solar Farm, ESCO NRG Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Braintree.

Customer
ESCO NRG Limited
Status
Connected
Capacity
18 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Voltage
33 kV
Date connected
12 Mar 2016
In a connection queue
No
Row last updated by the DNO
14 Nov 2023
Licence area
EPN
Address
Witham Road, Cressing
Postcode
CM77 8PD
Export MPAN
1050001047078

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source