Kentishes (Lyons Hall)

Kentishes (Lyons Hall), Energy and System Technical Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10.8 MW, grid supply point Braintree.

Customer
Energy and System Technical Limited
Status
Connected
Capacity
10.8 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Voltage
33 kV
Date connected
1 May 2018
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Braintree
Postcode
CM77 8BX
Export MPAN
1050001205354

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.